Coordinate the surface work before the lines return.
A combined sealcoating and striping project should begin with the pavement condition and the final layout. Cracks and repairs are typically addressed first, followed by surface preparation and sealcoating before striping is restored on the cured coating.
The old layout should be documented before it disappears beneath a new surface. Measurements, photos, site plans, and property approval help preserve useful stall counts, traffic flow, accessible areas, fire lanes, and custom markings.
Sealcoat cure time, weather, traffic, and coating compatibility affect when striping can begin. Call with the property location and desired scope to discuss whether both phases are currently available and how they could be coordinated.